The project is located in Hancheng, one of the top 100 counties (cities) in the western region, covering Hancheng, Weinan and Guanzhong areas and comprehensively disposing of hazardous waste. The treatment scope is: hazardous waste incineration, physical chemical treatment, drying and safe landfill.
The project IEA also implements the 2010/75/EC limits and installs the dioxin continuous sampling system.
The project covers Hancheng, Weinan, Xian, Xianyang and Tongchuan, with a total market volume of about 103,000 ton and the disposal capacity and coverage area are in full compliance with the “13th Five-Year Plan”.