References In Europe

 

CCGT Imola

The Installed Power: 80 MWe
Thermal Power for District Heating: 65 MWt
Operation Time: 12/2008
 

Parma (under test run)

Treatment Capacity: 130,000t/y
Installed Thermal Power: 2X37 MW
Electric Power Recovered: 20 MW
Thermal Power for District Heating: 40 MW
 

WTE Firenze (under design)

Treatment Capacity: 136,000t/y
Installed Thermal Power: 2X33 MW
Electric Power Recovered: 17.5 MW
Thermal Power for District Heating: 20 MW
 

WTE Ferrara

Treatment Capacity: 140,000t/y
Installed Thermal Power: 2X28 MW
Electric Power Recovered: 13 MW
Thermal Power for District Heating: 30 MW
Operation Time: 11/2007
 

WTE Forli

Treatment Capacity: 130,000t/y
Installed Thermal Power: 46.5MW
Electric Power Recovered: 13MW
Thermal Power for District Heating: 20MW
Operation Time: 08/2008
 

WTE Rimini

Treatment Capacity: 130,000 t/y
Installed Thermal Power: 1line, 46.5MW
Electric Power Recovered: 13MW
Thermal Power for District Heating: 20MW
Operation Time: 06/2010
Total:2   Current:1    << < 12 > >>

Contact Us

1.北京总部 Beijing Headquarter.
中国北京市东长安街1号东方广场E2-1506室
E2-R1506, No.1 East Chang'an Avenue, Oriental Plaza, Beijing, P.R.China 100006
T.+86 10 6830 8668   F. +86 10 6830 8669
2.上海办事处 Shanghai Office.
上海市福州路318号浦汇大厦2207-08室
R2207-08, No.318 Fuzhou Road, Cross Tower,P.R.China 200001
T.+86 21 5351 1966   F.+86 21 5351 1969
Email:info@hept.com.cn