The Installed Power: 80 MWe
Thermal Power for District Heating: 65 MWt
Operation Time: 12/2008
Parma (under test run)
Treatment Capacity: 130,000t/y
Installed Thermal Power: 2X37 MW
Electric Power Recovered: 20 MW
Thermal Power for District Heating: 40 MW
WTE Firenze (under design)
Treatment Capacity: 136,000t/y
Installed Thermal Power: 2X33 MW
Electric Power Recovered: 17.5 MW
Thermal Power for District Heating: 20 MW
WTE Ferrara
Treatment Capacity: 140,000t/y
Installed Thermal Power: 2X28 MW
Electric Power Recovered: 13 MW
Thermal Power for District Heating: 30 MW
Operation Time: 11/2007
WTE Forli
Treatment Capacity: 130,000t/y
Installed Thermal Power: 46.5MW
Electric Power Recovered: 13MW
Thermal Power for District Heating: 20MW
Operation Time: 08/2008
WTE Rimini
Treatment Capacity: 130,000 t/y
Installed Thermal Power: 1line, 46.5MW
Electric Power Recovered: 13MW
Thermal Power for District Heating: 20MW
Operation Time: 06/2010